Weekend Home Makeover ( Pt. 1 Cabinet Makeover)

by Withered Perception in Workshop > Home Improvement

856 Views, 7 Favorites, 0 Comments

Weekend Home Makeover ( Pt. 1 Cabinet Makeover)

temp_-1087152825.jpg
The market is just to good to sit on this property and keep it for a rental. So it needed some updating to sell for a premium. Here's how we did it.

I'm not going to show you before because this place was in shambles. Its almost embarrassing I owned this place.

Keep up. I'm not going into depth with these instructables! Time is of the essence! Check out all 6 to see the transformation.

Measure and Precut

temp_169471820.jpg
temp_1000432108.jpg
temp_-112706389.jpg
temp_1998965324.jpg
temp_-368800728.jpg
temp_1383374745.jpg
Its important you set up your work space before starting this project. This will help with maximum efficiency.

Now simply take the old cabinets and measure each side and record the measurements on to your new wood. I used poplar strips.

Add a Blade

temp_1002646404.jpg
temp_117190784.jpg
temp_84396125.jpg
temp_-1410131087.jpg
temp_1524670186.jpg
temp_692787146.jpg
temp_-2080637338.jpg
temp_360300855.jpg
temp_789089494.jpg
Turn off your power to your saw and add a second blade to your table saw.

Make a pass and check fit with insert. I used 1/8" plywood.

If snug make passes on all boards.

Clean Up

temp_1061061529.jpg
Making multiple passes makes a mess. Do a quick sweep. Trust me it helps!

Connecting Corners

temp_1222738596.jpg
temp_1126803487.jpg
temp_-1565332316.jpg
temp_73306164.jpg
temp_-1992073688.jpg
temp_953941145.jpg
temp_134179836.jpg
temp_-1122700114.jpg
temp_1243907392.jpg
Overlap your boards and make a mark.

Add a 3rd blade to your saw if you have it. It will make quick work of this task.

Check your depth to make sure pieces will be flush.


Make multiple passes taking off a bit each time until your board hits the fence.

Check fit.

Check, Glue, Fill

temp_-806184119.jpg
Check the new cabinet frames to the old cabinets.

Cut inserts to fit.

Glue and clamp overnight.

In the morning fill holes at the end with wood filler and lightly sand.

Check and Mount

temp_931888417.jpg
temp_2013725396.jpg
temp_350861570.jpg
temp_909654685.jpg
temp_291037524.jpg
temp_1807642675.jpg
Check to make sure cabinets are level and mark.

Add hindges.

Make sure to predrill to ensure a strong hold and minimize breaking frame.



Visual

temp_1584297653.jpg
Hang and check all doors with a quick visual once over.

Hardware

temp_-1707664963.jpg
temp_-219559648.jpg
temp_462954070.jpg
temp_-1457510906.jpg
temp_-475012517.jpg
temp_893617425.jpg
temp_-2008867037.jpg
temp_-150903957.jpg
temp_1146416335.jpg
temp_1513145525.jpg
temp_430986657.jpg
temp_-2083877919.jpg
temp_-1611072772.jpg
temp_1995611740.jpg
temp_-419222058.jpg
Measure and drill locations for hardware.

Recess all screw heads.

Do the same for the drawers.

Slap on Some Paint

temp_-79015471.jpg
Move to the next room.