Vibration Isolator
DIY vibration isolation platform
Supplies
Amazon Orders:
2x SK8 Aluminum Linear Motion Rail Clamping Rod Rail Guide Support for 8mm (Pack of 4)
https://www.amazon.com/dp/B07QS7Z8MK/
2x SCS8UU Linear Ball Bearing Slide Block Units, 8mm Bore Dia (Pack of 4)
https://www.amazon.com/dp/B07GQYTHMD/
1x 8mm x 150mm 304 Stainless Steel Solid Round Rod for DIY Craft - 10pcs
https://www.amazon.com/dp/B082ZNWR1G/
McMaster Orders (1x each):
47065T905 T-Slotted Framing, End-Feed Single Nut, 1/4"-20 Thread, packs of 25
90101A230 18-8 Stainless Steel Thin Nylon-Insert Locknut, 1/4"-20 Thread Size, packs of 50
9657K384 Compression Spring, 2" Long, 0.3" OD, 0.256" ID, packs of 6
9657K389 Compression Spring, 2" Long, 0.42" OD, 0.326" ID, packs of 6
9657K701 Compression Spring, 2.5" Long, 0.360" OD, 0.296" ID, packs of 12
8505K734 Clear Cast Acrylic Sheet, 12" x 12" x 1/4", Gray
47065T101 T-Slotted Framing, Single 4-Slot Rail, Silver, 1" High x 1" Wide, Solid, 8' Long
47065T101 T-Slotted Framing, Single 4-Slot Rail, Silver, 1" High x 1" Wide, Solid, 8' Long
47065T663 (8x) Silver Gusset Bracket, 1" Long for 1" High Rail T-Slotted Framing
Variety of #¼-20 and M4 bolts
Vibration Isolator Diagrams and Photos
Vibration Isolator Diagrams And Photos
CAD
Source Files
Chassis Assembly
1. Cut the following lengths of the 80/20 extrusions:
2x 18” long 1” x 1” extrusion
1x 16” long 1” x 1” extrusion
2x 8” long 1” x 2” extrusion
2. Using an F size drill bit, make the screw holes of the SK8 rod clamps larger (to the through
hole size of ¼”-20 screws)
3. Looking at the below image, assemble the 3D printed parts, cut extrusions, and rod clamps
together. Slide in the axles only for the two central rod clamps, and tighten them.
Table Assembly
1. Put together the below assembly, putting together the axle, linear ball bearings, as well as
connectors for the table.
2. Laser cut ¼” acrylic using the file Tabletop.ai. Assemble the assembly from 1) to the laser cut
acrylic tabletop.
3. Assemble the vertical ball bearings as well as spring holders to the tabletop.
Isolator Assembly
1. Place the tabletop on the assembled chassis, sliding the vertical ball bearings onto the
vertical axles.
2. Slide in the four axles for the negative stiffness structure.
3. Place the desired springs into the spring holders in both the vertical and horizontal portions,
depending on your desired calculations. Our suggestion for a wide range of vibration isolation is:
8x 9657K701 at the bottom
3x 9657K389 per side
2x 9657K384 per side