Sweet Little Sugar Drawers

by scottdesignworks in Workshop > Organizing

1442 Views, 27 Favorites, 0 Comments

Sweet Little Sugar Drawers

F9E26XPKVDTGWJ8.jpeg
675ABDA1-F1A1-409C-8B48-8DF358AFCE2F_1_105_c.jpeg

I scavenged a box of these restaurant sugar packet holders at an auction a while back, and figured they would be good for storing/organizing small parts in the studio. They are very thick and durable plastic compared to the easily breakable small parts drawers we’ve seen before. For simplicity I decided to use the thick ridge on top of the sugar holders to be the drawer glides. This way I would only need some slots for them to ride in.

SketchUp Model

SketchUp of Sugar case.png

I made a SketchUp model of the spacing so I could see what it would look like. It requires one 1”x4”x8’ to build a 4x5 drawer unit. I decided to make it larger (6x6 drawers) so I bought two 1”x4”x6’ boards.

Prototype

D294220B-3378-4727-85A9-641837AF56E8_1_105_c.jpeg
4B4195AD-EA1F-4675-8F81-5E4BBD8CD4F8_1_105_c.jpeg

I also made a little test piece from scrap to make sure the drawers would slide well, and they did.

Cut Wood to Length

1C91F056-1EAA-4E50-B6F2-40F514186404_1_105_c.jpeg
7E268A17-25F4-4105-845F-732D4D572F8F_1_105_c.jpeg
7E95ACB4-6D9A-41E2-B3FB-A95D5B9E4949_1_105_c.jpeg

For the 6x6 unit you’ll need 2 pieces 19 ½” long. 7 pieces 13 ¾” long.

Cut Dados

128142FB-29A3-4557-8756-59EAEEEFC0E5_1_105_c.jpeg
E691AF07-75AD-41F0-B41A-90400B21759B_1_105_c.jpeg
04B854F2-0751-451C-9889-24127CED4BC2_1_105_c.jpeg
95B90303-F0B4-4C4E-A539-86A72B5930C0_1_105_c.jpeg

Cut ¼” dados 2” apart and 3/16" deep in the 5 vertical pieces. Set up the saw to cut each dado and then run all the pieces through before setting up the next cut. Don’t forget to do both sides of the middle pieces

Make Spacers

91B7114A-F2C2-48AE-B4D2-FF71BBBE7610_1_105_c.jpeg

Apply 2-3 layers of masking tape to the top part of 12 sugar tubs. These will be used as spacers.

Start Assembling

93AF8EEA-B4D7-488F-A3FD-1B0CD49FF8CF_1_105_c.jpeg
84925F6A-770E-4929-8901-1A7C419196B0_1_105_c.jpeg

Glue and nail one side to the top and bottom.

Add Spacers

4F5CCD60-FCDC-4FA8-991B-3180E2FD0AC9_1_105_c.jpeg
6E141960-6B71-4DD0-B97B-F6AF9FE8169E_1_105_c.jpeg

Insert the first middle piece between the top and bottom on top of the spacers. 

Nail in Place

14848832-CF85-4863-B8D8-4A0148C6A752_1_105_c.jpeg

Continue

17125DB3-A000-4618-A228-D38E2C6FEE83_1_105_c.jpeg
533DBEC8-48FD-43E2-B15D-77934E87C4DE_1_105_c.jpeg

Add spacers and repeat for the rest of the vertical pieces.

Clamp

8E3467FD-8764-4734-AC03-2A035CAA39CF_1_105_c.jpeg

Clamp it if there are any gaps.

Remove Spacer Tape

19F0650E-C29F-4A34-9C2D-3D9E7AF96D7B_1_105_c.jpeg
78797B79-1021-4D79-A6CA-B4457B81B9A3_1_105_c.jpeg

Fill Nail Holes

99FE8038-1F2E-4699-B0B5-EEE324E2F75A_1_105_c.jpeg

Sand and Varnish

DDF54BB0-0B05-4FBF-A11B-486D952CAAAC_1_105_c.jpeg
5DC6D65B-2CDC-4349-8F64-97525DE03E55_1_105_c.jpeg

I used water base polyurethane.

Load It Up!

91B9C23F-9D9B-4559-8EDA-A945A20D950F_1_105_c.jpeg
675ABDA1-F1A1-409C-8B48-8DF358AFCE2F_1_105_c.jpeg
49BC1E4D-2F21-4D9A-91A1-CF89F0ED4E72_1_105_c.jpeg