Fulcrum

by asred in Workshop > Tools

10235 Views, 79 Favorites, 0 Comments

Fulcrum

IMG_7809.JPG

If you ever want to pull a fence post out you'll want a fulcrum to help. The idea is simple, apply leverage to pull the post out like a crowbar does a nail. This instructable will tell you how to build the fulcrum. How you use it is up to you. Like any tool, fulcrums pose a risk of danger when used. Use these plans and the fulcrum you build at your own risk. I accept no liability for any impact incurred from their use.

Tools:

  • Miter Saw
  • 1/2" socket wrench and handle extender
  • Drill
  • 10" x 3/8" auger drill bit
  • 1/8" drill bit
  • Square

Materials:

  • One 4"x6"x10' wood beam
  • One 1"x4"x4' piece of scrap wood
  • Four 10"x3/8" lag screws with 1/2" socket cap head
  • Two 6"x3/8" lag screws with 1/2" socket cap head
  • Two 4 inch wood screws

Cut the Lumber

IMG_7675.JPG
IMG_7680.JPG
IMG_7679.JPG
IMG_7678.JPG
IMG_7676.JPG
  1. Cut the 10 foot 4x6x10 in half (at 5 feet).
  2. Cut one of the 5 foot sections in half again with a 45 degree cut. The cut should start at 27.5 and end at 32.5 inches.

Dry Fit Assembly

IMG_7683.JPG
571adb4245bceb3bea0017f2.jpeg
571adb4b15be4dcde7000883.jpeg
571adb5645bceb3bea0017f4.jpeg
IMG_7685.JPG
  1. Using the drill and a 1/8 inch bit, pre-drill one 4" hole in each of the short pieces as shown in the first picture. This will be for a set screw, after you finish dry-fitting the fulcrum together.
  2. Place a square at the end of the 5 foot beam. Dry-fit the pieces together. The shorter pieces should be flush with the center 5 foot beam.
  3. Screw a scrap piece of wood to all three pieces of the beam to help hold the legs in place.
  4. Screw the 4 inch set screws into the holes you pre-drilled.

Final Assembly

IMG_7699.JPG
IMG_7701.JPG
IMG_7702.JPG
IMG_7703.JPG
IMG_7704.JPG
IMG_7715.JPG
IMG_7805.JPG
  1. Using the auger bit, pre-drill three holes for the lag screws in each leg in a triangle pattern. Note, try to aim the bit so that your screws from each side of the fulcrum don’t run into each other. The holes should go at minimum 2 to 3 inches through the center 5 foot beam.
  2. If your drill can muster it, save some time and drill the lag screws in as far as you can then finish the job with the socket wrench and the handle extender. The shorter lag screws go in at the short end of the junction. The log lag screws go in lower, where there is more material to go through.
  3. Finally move the 1"x4"x4' to the bottom of the fulcrum, maybe three inches from the bottom. Then cut the excess off.
  4. Remove the temporary scrap piece of wood you used during the dry fit process.