DIY Reno New Tile Flooring + How to Change a Toilet

by Zaphod Beetlebrox in Workshop > Home Improvement

8064 Views, 17 Favorites, 0 Comments

DIY Reno New Tile Flooring + How to Change a Toilet

IMG_4761.JPG
IMG_4551.JPG
IMG_4826.JPG
IMG_4558.JPG
IMG_4560.JPG
IMG_4642.JPG
IMG_4643.JPG
IMG_4682.JPG
The Story (why this belongs in the maker moms contest). My Nana (Dad's Mom)  supported his making of things while he grew up, much like he has supported my endevours.  So when Nana called us to ask if we could tile her bathroom and upgrade the toilet, we were happy to agree. 
The Team: Me , my brother Adam, My Dad, and Some help from my cousins. 
The Plan: Our original plan was to tear out the linoleum and set the tiles directly against the concrete floor, however we had to re adjust our plan later. We would also be taking out the old toilet and be replacing it with a new dual flush eco toilet. 

Before you get started this project involves the use of power saws and sanders, as well as the risk of asbestos exposure. I am not responsible if you harm yourself during the course of this project. 

Materials and Tools

IMG_4543.JPG
IMG_4544.JPG
IMG_4546.JPG
IMG_4547.JPG
IMG_4548.JPG
IMG_4550.JPG
IMG_4552.JPG
IMG_4553.JPG
IMG_4719.JPG
IMG_4832.JPG
IMG_4836.JPG
IMG_4837.JPG
IMG_4842.JPG
IMG_4873.JPG
IMG_4890.JPG
IMG_4891.JPG
IMG_4919.JPG
IMG_4631.JPG
IMG_4770.JPG
IMG_4776.JPG
IMG_4833.JPG
IMG_4568.JPG
IMG_4877.JPG
IMG_4886.JPG
Materials:
Tile cement/Mortar
Sanded Grout
Tiles
Spacers (for larger floors)
Grout Sealer
Water
New toilet
new wax ring
new toilet hardware (screws bolts)
Rags x  about 5
stick

TOOLS:
Tile Cutter
Tile cutter blade (diamond cutting edge)
wrench (for toilet)
sponge 
Notched Trowel
Putty Knife
Several Buckets about 3
screw driver
belt sander with sand paper belt
extension cord
crayons
dust pan (smiley face not needed) + broom
garbage bags
Dust Masks

Other Handy Tools That aren't completely necessary :
electric drill
Stirring attachment for electric drill  
Knee pads
Pizza




Remove Toilet

IMG_4561.JPG
IMG_4562.JPG
IMG_4563.JPG
IMG_4564.JPG
IMG_4571.JPG
IMG_4573.JPG
IMG_4574.JPG
IMG_4577.JPG
IMG_4581.JPG
IMG_4556.JPG
The first step for removing the toilet is to shut the water off in your bathroom (if that's possible) and then flush the toilet until most off the water out. Even after flushing  a few times there will still be some water left in the bowl, to remove this fill one of the buckets with water. Next forcefully pour the water into the bowl , dump the bucket down. This will force most of the remaining water out of the toilet. Next turn the house's water supply off (If you haven't already). Then disconnect the water line that heads into the toilet, it is a bendy metal tube that connects to the wall. then you can either take the toilet out as one piece or in two (depends on your toilet). To take it out as one piece first pop off the caps that cover the screws on the bottom of the bowl, then unscrew them. The toilet can now be lifted out, be careful there is still water in the U bend of the toilet so either prepare to clean up some spilled water or have a towel or bucket ready to catch the drips. We put ours into the bathtub to drain some of the extra water out. It was then thrown out. Next stuff a rag into the hole that the toilet used to be on top of, this stops sewer gasses from seeping up and stops things from going down  accidentally.  You do not have to remove the wax ring just yet. Tighten the valve on the intake to the toilet.  The water can now be turned on again, however be careful not all of the valves may be completely water tight, so have a bowl or bucket underneath to catch any leaks. 

Remove (Or Don't Remove) the Linoleum Floor

IMG_4599.JPG
IMG_4600.JPG
IMG_4602.JPG
IMG_4606.JPG
IMG_4609.JPG
IMG_4620.JPG
IMG_4622.JPG
If your confused by the title of this step let me explain. Before 1978 (at least in Alberta) asbestos was used in the paper backing applied to the underside of the linoleum, so unless you happen to have full asbestos removing gear laying around don't pull up your linoleum if its older than 1978. My Nana's house was built in 1979 so we decided not to risk it and instead of ripping the up the old linoleum we decided to trim off the peeling bits and then lay the tiles over top of the linoleum. Begin by doing your research to see if  you should remove your linoleum. After that is established remove the floor boards (if there are any)  and begin to peel/rip away the linoleum. Depending on how much linoleum your removing this could take either a long time or be a vary fast step. Clean out any of the stuff in the bathroom and throw out the old lino. 

Dry Fit + Measure and Cut Tiles

IMG_4640.JPG
IMG_4658.JPG
IMG_4660.JPG
IMG_4667.JPG
IMG_4673.JPG
IMG_4676.JPG
IMG_4678.JPG
IMG_4680.JPG
IMG_4681.JPG
IMG_4682.JPG
IMG_4694.JPG
IMG_4696.JPG
IMG_4698.JPG
IMG_4703.JPG
IMG_4707.JPG
IMG_4711.JPG
IMG_4721.JPG
IMG_4724.JPG
IMG_4728.JPG
IMG_4730.JPG
IMG_4736.JPG
IMG_4743.JPG
IMG_4752.JPG
IMG_4755.JPG
IMG_4758.JPG
IMG_4759.JPG
Begin by placing all the tiles that do not need to be cut into the room. next begin by marking the tiles that need to be cut with a crayon. You could measure how much needs to be cut off, however it is faster to place the tile into the place it needs to be and then marking it with a crayon. absolute precision is not required, especially in small rooms. In larger rooms a greater level of accuracy may be needed. In places were it is possible to hide the cut edge underneath the cabinet and floor boards flip the tile upside down before measuring.  Next fill the saw's trough with water and mount the blade, plug in saw and  to a test to make sure the water pump is working, doing a test cut on a spare or broken tile is also a good idea.  Next label the bottom of the tiles and remove them from the space. We used a co-ordinate system to ensure each tile was put back in the right place. 

Sand Linoleum

IMG_4769.JPG
IMG_4771.JPG
IMG_4775.JPG
IMG_4641.JPG
IMG_4765.JPG
IMG_4766.JPG
IMG_4767.JPG
Next run a sander over the linoleum to aid with the adhesion of the mortar. Wear a dust mask, the asbestos is not in the top of linoleum so you don't need full bio hazard suits. Then stop for a Pizza break, however this is not necessary.  

Mix Mortar and Lay Down Tiles

IMG_4778.JPG
IMG_4781.JPG
IMG_4784.JPG
IMG_4787.JPG
IMG_4792.JPG
IMG_4793.JPG
IMG_4795.JPG
IMG_4796.JPG
IMG_4799.JPG
IMG_4801.JPG
IMG_4811.JPG
IMG_4813.JPG
IMG_4814.JPG
IMG_4830.JPG
IMG_4831.JPG
The mixing is best done outside, so grab a bucket and hose and go catch some rays. Follow the mixing instructions on the package of mortar. It should be thick enough to not run but thin enough to be workable. next come up with a plan of laying down the tiles so that you don't have to step on other newly laid tiles while you put the others down. We went from the back left corner to the front right corner of the room. use the trowel to put the cement on both the floor and the tile. Grooves should be on both. Different mortars require different sized notches, so make sure that you mortar and trowel match up. This is were if you have a larger room the spacers come in handy to keep the distances between the tiles the same. A couple of rags are handy here to help keep the mortar were it should be and off of the walls. Next wait 24 hours and then clean any mortar off that is on top of the tiles. Then if there are any gaps in the tiles that are filled in by concrete scrape it out with something. 

Grouting

IMG_4843.JPG
IMG_4849.JPG
IMG_4850.JPG
IMG_4854.JPG
IMG_4857.JPG
IMG_4858.JPG
IMG_4859.JPG
IMG_4863.JPG
IMG_4864.JPG
IMG_4868.JPG
IMG_4871.JPG
Just like the mortar the grout is also best mixed outside. Mix according to the directions on the box, it should be thinner than the cement. Next just like laying the tiles formulate a plan of efficient movement through the room so you don't have to step on the grout. The grout goes right over top of the tiles (you know how you just cleaned them), if you have a younger helper this is the time that they can go wild. just smear the grout all over so that it goes into all the gaps left in the tiles. then wait about 30min and start to wipe off the grout that is still on top of the tiles, this is best done with just the sponge and water. You can step on the tiles but not on the grout so be careful.  After a few days and a couple floor cleanings the grout sealer can be applied, again follow the instructions on the bottle. 

Install New Toilet

IMG_4877.JPG
IMG_4881.JPG
IMG_4882.JPG
IMG_4884.JPG
IMG_4885.JPG
IMG_4887.JPG
IMG_4894.JPG
IMG_4898.JPG
IMG_4900.JPG
IMG_4899.JPG
IMG_4902.JPG
IMG_4907.JPG
IMG_4911.JPG
IMG_4912.JPG
IMG_4914.JPG
IMG_4919.JPG
IMG_4920.JPG
IMG_4921.JPG
IMG_4924.JPG
this is vary similar to taking the toilet out except in reverse, with the exception of putting in a new wax seal. Begin by removing the rag and old wax seal. Next place the new wax seal in position, bring in the toilet bowl and press it firmly onto the new wax seal. Then tighten the bolts. Place the large rubber seal between the bowl and tank. Next place the tank on top of the bowl and tighten those bolts as well, make sure that the rubber seal is on the inside were the water will be. Then turn the water off again. Re attach the inlet water hose to the toilet, and loosen the valve. The water can now be turned on again, the toilet should fill up, as always always place something underneath to catch any possible leaks.  once the toilet is working properly (do a couple test flushes) the lid and seat can be installed. The seat goes on with screws and the lid with gravity. Thats it  all thats left is clean up.

I am in no way a professional and your comments are always appreciated, Please let me know what you think of this 'ible by rating it (and if you really like it or found it helpful a vote) thanks for reading - Zaphod