Choo-Choo Chairs: a New Life for Boston's Metro Seats

by CobyUnger in Workshop > Furniture

10421 Views, 33 Favorites, 0 Comments

Choo-Choo Chairs: a New Life for Boston's Metro Seats

Logo Pic.jpg
IMG_5872.png
IMG_5866.jpeg
IMG_5862.jpeg

The Boston Metro (MBTA), the oldest subway in America, is replacing all of the Red Line subway cars over the next year or so. The Red Line runs from deep in Cambridge to deep into Boston, and for years, I was one of the many thousands of people commuting on these trains daily. With a bit of persistence (see step 1), I was lucky enough to get my hands on some seats from the old trains. The original red line trains were built in 1965, but these seats are only a few decades old. After some other shenanigans with a few of the seats, I decided to run a class to give them a second life as chairs. Bobby, Cathy and Madavin did an amazing job and built some beautiful and extremely strong chairs made only from re-used parts.

Supplies

Materials:

MBTA Red Line Seats

Re-claimed Church Pews

Cleaning Vinegar

Bolts

Glue

Gel Varnish


Tools:

Table Saw

Miter Gauge

Tenon Jig

Jointer

Planer

Table Router

Thickens Sander

CNC Router

Just to make jigs

Chisel

Pull Saw

Clamps

Socket Wrench

Drill

Wire Brush

The Team

42C873B2-FE32-443D-BD2D-1CF0D62F336F.jpeg
20220803_191623.jpg
20220831_180610.jpg
IMG_1888.jpeg

This project was run as a class in the MIT Hobby Shop. The chairs were designed by me, Coby Unger, and built with help from Bobby Johnston, Cathy Melnikow, Madavin Vong, with teaching assistance from Michelle Lauterback. Thanks also to Andrew, Jay, Steve and Michael at the MBTA for hooking us up with old seats and to Joel for giving us access to the church pews and to Bob, Fred and Jerome for helping to dismantle them all.

Every Material With a Story

72BBECF9-26DC-4A8D-B961-E7108B3141DC_1_105_c.jpeg
66758305482__D4A54A2E-102E-4AF6-AB95-797D8740FD7E.jpeg
image001.jpeg
image002.jpeg
IMG_4767.jpeg
aboard-new-red-line-1573140734.png
E1532FDF-4B64-4DEE-8FDE-AA099FF20565_1_105_c.jpeg
994993B1-5932-4871-86A3-493D45437002_1_105_c.jpeg
32EA5F08-C12F-4F8E-87CA-23ADD16FCDDA_1_105_c.jpeg
6465E0C3-8E9B-49DF-8E32-14E9AA013C01_1_105_c.jpeg
701DFA1C-F54F-41D4-B335-EF28E3A0C01E_1_105_c.jpeg
1FCA284A-797F-45B6-ACEF-35579AF2F048_1_105_c.jpeg
2DF18683-8D2F-4C91-A6D4-7B85E4C34CDA_1_105_c.jpeg
3ADFE1B0-D2CD-4B98-8BE1-C9B79966036C_1_105_c.jpeg
4B4F17BA-6AB8-4666-8D3D-0716EAC37B1C_1_105_c.jpeg

One day in early February 2022, coffee in hand, I was surprised to find myself boarding a bright clean quiet Red Line train in Davis Square. This was different.... It looked different, it smelled different, it sounded different. The seats were a brand new red foamy material rather than the purple patterned carpet I was so accustomed to. Upon sitting down, and taking in the new look on that peaceful morning, my mind quickly drifted as I wondered what was the fate of the old seats. In past journeys, I had admired the stainless steel construction of these seats and their iconic (some would say ugly, but not me) fabric. So I did some quick internet searching and found some email addresses for the sustainability office at the MBTA and shot them a quick email. A long shot, I thought, but how cool would it be to get a seat from the old trains?! Many, many emails later, and a home-made shirt (to convince them I was really invested in the cause), they agreed to give me some chairs. To my further surprise, they even gave me some fresh upholstery pads for the seats as well. Just goes to show how far persistence goes...


As for the wood, that is a different story. A couple months before the whole red line story starts, my colleague Hayami at the MIT Hobby Shop asked "Hey, do you want a bunch of old oak?". It turns out that his friend's company had just bought an old church and were planning on converting it into apartments. They had no use for the pews, but recognized it was decent wood. If we did the demolition and hauled it all out, we could have all the lumber. So I called up a few my friends, and a few of my dad's friends, and we spent a Monday dismantling a church. A few months later, another friend asked me if I wanted still more oak church pews from yet another church. So here I am with two churches worth of pew wood. Thank goodness I have access to a couple barns for storage.

The CAD Model

Screen Shot 2022-09-09 at 10.59.09 AM.png

We ended up using the CNC router very little in this project (just to make jigs), but even so, having a Fusion 360 model to refer back to periodically was quite helpful. We used it to confirm dimensions and angles throughout the project. The model only includes the legs, since the subway seat was pre-made and not modified at all.

Cleaning the Seats

20220729_161909.jpg
20220729_162144.jpg
20220729_163524.jpg
20220729_162221.jpg
20220729_162227.jpg
20220729_162251.jpg
20220729_164340.jpg
20220729_170214.jpg
20220729_151916.jpg
20220729_151925.jpg

The construction of the MBTA seats was, as it turns out, even more impressive than I had thought. The upholstered cushions fit on with a couple simple tabs and two lock nuts. They are almost completely made of stainless steel except for, very disappointingly, the structural members where they attach to the train. And it turns out that decades of service on a train, and a few too many spilled sodas, meant that there was some rust to contend with. Nothing a couple wire wheels and a bucket of cleaning vinegar can't solve. Pro tip, wear gloves next time.

Rough Cut Wood

20220803_180848.jpg
20220803_180934.jpg
20220803_174926.jpg
20220803_174839.jpg

I designed the legs so that each pair could be cut from one church pew end support. We used the band saw to roughly cut the pieces. The pew base was nailed on through oversized holes and was easy to take off. We eventually used these parts as the top of the chair base.

Dress Wood

20220803_182906.jpg
20220803_182913.jpg
20220803_183308.jpg
20220803_183316.jpg
20220803_191740.jpg

After rough cutting, we jointed and planed the pieces so they would all be straight and exactly the same thickness. This was also a great way to get rid of all of the dark old churchy stain covering up the beautiful oak underneath.

Leg and Apron Cutting

20220805_172032.jpg
20220805_152207.jpg
20220805_154202.jpg
20220805_155705.jpg
20220805_161012.jpg
20220805_164503.jpg
20220805_164506.jpg
20220812_181143.jpg
20220817_152633.jpg
20220805_164510.jpg

The back and front legs are at slightly different angles and so are slightly different lengths. We cut the angles with the compound miter saw, and used a simple tapering jig on the table saw to cut the leg to final width and angle. The tapering jig is a sled that slides in the slots of the table saw, with an angled fence and toggle clamp. These are easy jigs to make, but endlessly helpful for making repeatable tapers.

Half-Lap Joints

20220810_165723.jpg
20220810_165731.jpg
20220810_165740.jpg
20220817_153341.jpg
20220810_172818.jpg
20220810_154535.jpg
20220810_163241.jpg
20220810_182129.jpg
20220810_182632.jpg
20220817_154110.jpg
20220817_163539.jpg
IMG_1892.jpeg
20220810_183331.jpg
20220810_183343.jpg
20220812_150833.jpg
20220812_154154.jpg
20220817_171737.jpg
20220817_174943.jpg
20220819_150813.jpg

A 90 degree half-lap joint is quite simple to achieve in a number of ways in the wood shop, but we have angles to contend with. 5 degrees for the front legs and 15 for the back. We cut parallel to the top of the leg with the miter gauge on the table saw and then parallel to the face of the leg with custom jigs for the tenoning attachment for the table saw. We made 4 unique jigs for each of the legs to keep the thickness of the half-lap consistent across all legs. This is the first time in the project where the legs are no longer "ambidextrous". Much to the chagrin of the students in the class, the table saw blade did not reach quite high enough to cut the joint completely, so we had to do some saw and chisel work. But wow, look at those joints! So clean!

Swing Break!

20220812_155944.jpg
20220812_181749.jpg
20220812_181825.jpg
79413BE4-D328-4EDE-8FE3-E99F53534695_1_105_c.jpeg
9D84126E-CBD4-4C54-B96C-AE89C0BF41ED_1_105_c.jpeg
7C483DC2-7D0D-4DC7-8431-2BE492D4B246_1_105_c.jpeg
20220729_161938.jpg
20220729_161928.jpg
BAE61FC7-7CB5-4C2F-8723-5EBE121B814D_1_105_c.jpeg

Everyone has been working hard on this project and deserves a break. We strung up one of the seats on stainless steel cables and did some swinging. The chisel technique demonstrated in the above picture is NOT recommended. Always clamp your work and never use sharp tools while swinging. Also a bike, because why not.

Glue Glue Glue

20220817_183329.jpg
20220817_183333.jpg
20220817_184445.jpg
20220824_140752.jpg

Half laps are relatively straight forward to glue. Nothing fancy, we just had to make sure all the seams were closing. Glue should be applied to every surface that makes contact when the joint is assembled. Each leg gets one F clamp and dried for at least 6 hours.

First Sanding

20220819_163814.jpg

The half-lap joints were really tight, but to make sure there is no thickness discrepancy between the parts of the chair after gluing, we put all the leg assemblies through the thickness sander.

Another Angled Cut

20220819_150850.jpg
20220819_151103.jpg

For a little added stability the legs splay out sideways by 5 degrees. This angle should have been a simple table saw cut, but the blade was too close to the end of the fence, so we had to make a quick extended fence to cut cleanly.

Aprons

20220819_153451.jpg
20220803_193042.jpg
20220819_161015.jpg
20220819_161625.jpg
20220819_164735.jpg
20220824_163649.jpg
20220819_164759.jpg
20220819_170126.jpg
20220824_155347.jpg

We'll call the top piece of each leg assembly the apron. It's not quite the same as a table apron, but I don't know what else to call it. These are what eventually bolts to the MBTA train seat. The lumber for these is from the bottom of the pews and it already had 4 perfectly placed holes for screwing it in place to the rest of the leg assembly. We cut the ends of these pieces to match the leg angles and added the 5 degree taper before gluing and screwing them on. The angles were cut at the top of the leg assemblies so that the leg gets trapped in the half lap joint when the apron is screwed on. This probably isn't, strictly speaking, necessary, but it adds some strength in hope that the chairs will last as long as they did as train seats.

Chamfers

20220824_174250.jpg
20220830_154752.jpg

We used a router to add a simple chamfer to most of the corners for comfort and aesthetic appeal. In hindsight, we should have done this to the inside corners before attaching the apron, as now, they are inaccessible by a router bit.

Stretcher

20220831_150420.jpg
20220831_143048.jpg
20220831_151107.jpg
20220831_151445.jpg
20220831_152634.jpg
20220831_171659.jpg
20220831_171729.jpg
20220831_180254.jpg
20220831_180352.jpg
20220831_180615.jpg
20220831_181435.jpg
20220831_184025.jpg

The final table saw step on this project was to add a stretcher to the back legs. Once again, probably not ultimately necessary, but what's the point of building if we aren't over-building. We used the miter gauge and a dado blade to cut a slot in each back leg at the 5 degree angle to match the splay of the legs. We cut the stretchers from leftover pieces of oak. As a fun aside, to make a bench rather than just a chair, the only dimension that needs to change is the length of the stretcher. Then two or three seats can be bolted together as they were on the train.

Bolt Holes

20220830_155529.jpg
20220830_155931.jpg
20220830_164825.jpg
20220830_164829.jpg
20220831_134208.jpg

The seats already have holes drilled in the steel structural members, so for assembly, we just needed to drill matching holes in the wood and bolt them together.

Sanding and Finishing

20220906_135331.jpg
20220906_135609.jpg
20220906_140147.jpg
20220906_180157.jpg
20220906_183202.jpg
20220907_190441.jpg

For many beginner wood workers (and many with experience too I suppose), the sanding phase is met with much dread. My only advice here is to put on some good music and submit yourself to your new temporary reality as servant to the scratch marks. We sanded the legs to 220 grit and finished with 3 coats of General Finishes Gel Topcoat.

Assemble!

D848B102-0F11-4DE3-8103-89BE5E5584E8.jpg
9251416F-062B-4776-A840-E259EF7398B8.jpg
IMG_5858.jpeg
IMG_5865.jpeg

The moment we have all been waiting for. Time to assemble the chairs. 2 nuts hold on the upholstery, 4 nuts and bolts hold on the legs, and 2 wood screws hold on the stretcher.

Field Trip

10E1CB05-E465-480C-A4E9-30754233DE2B.jpeg
BC247550-E14F-4161-987F-ACC34F565A0E_1_105_c.jpeg
1C1DB58A-234C-4F65-B667-1720E3A08651_1_105_c.jpeg
541F038E-9F13-4E29-A32F-4E551E40504C_1_105_c.jpeg
0434EE13-7F7F-4144-99F0-0129D745B749.jpeg
80107D2C-B646-4A39-9083-FDB8522DEECC.jpeg
EC1B112E-BA40-458C-AE7A-B6F955FA1E06_1_105_c.jpeg
10406BD8-4FC6-4D73-B928-8549C16E8076_1_105_c.jpeg

*This is not an ad for Dunkin' Donuts.*

The only thing more Bostonian (or Cantabrigian) than the MBTA is Dunkin' coffee and donuts on the MBTA.

Here are some selections from our album cover photo shoot. If only we could play music.....