Barrett & Tzib Rover
by jeremiah.barrett in Workshop > Metalworking
249 Views, 1 Favorites, 0 Comments
Barrett & Tzib Rover
This is the beginning piece of our BT Rover. The supplies are as listed
30 screws
20 toothed nuts
3 treaded wheels
10 lock nuts
2 VEX motors
1 VEX CPU
1 VEX battery
1 VEX signal transferrer
3 rubber bands
3 signal cords
1 VEX power cord
1VEX controller
2 10 In. 3 by 1 holed metal strips
2 12 In. 3 by 1 holed metal strips
2 4.75 In. 3 by 1 holed metal strips
2 8 In. 3 by 1 holed metal strips
1 10 In 3 by 3 holed metal strip
Build the Chasse
Gather the metal stirps and screw them together in a rover formation.
Add the Motors
Apply the motors to the back of the rover while attach the wheels to the motors.
Adding the Battery, CPU, and Vex Router
Apply the battery to the back of the rover by attaching rubber bands. Then screw the CPU to the front of the rover. Screw in the Vex router to the back of the rover.
Wiring the Rover
Apply signal cables to the motors connecting them to ports 1 and 2. And attaching battery to CPU through power cable. Then wire Vex router port 10.
Programming the Rover
Then use VEXcodev5 to apply default train program to motors. Signal Vex router to pair to controller.
This is the final project after attaching third wheel to the front of the rover.